top of page

Working in the cold and rain

Today, Alistair got hold of a bucket equipped telehandler so we moved most of the ballast down to the platform in heavy rain and sleet. The inside of the pile was still frozen, but fortunately it only took 90 minutes.




Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Twitter Basic Square

@dolgarrog_railway

© 2021 Dolgarrog Railway Society Limited - a company limited by guarantee.

Registered Office:   Ty Mawr, Llan Rhychwyn, Nr. Trefriw, Conwy, LL27 0YJ. Registered in England and Wales No: 5019888

    bottom of page