Work On The Platform Continues

  • dolgarrograilway
  • Jul 25, 2014
  • 1 min read

Great progress continues on the platform, with approximately half of the uprights now in the ground.

Once all current uprights are in the ground, it will be time to dismantle the end track panel in order to allow space to store the concrete sleepers, access for machinery for dropping the sleepers into place, and to allow for adjusting the sub-base of the track, which is a little too high, so the railhead is the correct height throughout the platform. Other sections of track will need to be lifted and packed.

WP_20140712_001[1].jpg
WP_20140712_002[1].jpg
WP_20140712_003[1].jpg
WP_20140712_004[1].jpg

Following photograph taken by Dave Williams, showing the JCB busy digging one of the holes.

IMGP4306.JPG

Following photographs taken by Malcolm Wrigley showing the full progress so far with 8 uprights in place.

V__3E11[1].jpg
V__952D[1].jpg


 
 
 

Recent Posts

See All
Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Twitter Basic Square

@dolgarrog_railway

© 2021 Dolgarrog Railway Society Limited - a company limited by guarantee.

Registered Office:   Ty Mawr, Llan Rhychwyn, Nr. Trefriw, Conwy, LL27 0YJ. Registered in England and Wales No: 5019888

    bottom of page